PITWALLFLEET RELIABILITY
ProgramPitwall CrewSite workshopPlatformPartsInsightsAbout

Reliability program for mining fleets · Australia

Call the stop before the failure.

We audit your asset register and maintenance strategies, work them through with your crew at your site, and run the agreed strategy in Asset Reliability Cloud, with the parts on the shelf when the job starts. Fewer unplanned stops. More hours your fleet is available to dig and haul.

Works withPronto XiMicrosoft Dynamics 365SAP
Fleet board · Day shiftIllustrative
HT-07Wheel motor change-outKomatsu 930E · due in 140 SMU · kit stagedPlanned stop
HT-21Oil sample: high iron, final driveCAT 793F · resample at next PMWatch
DR-02Rotary head rebuildEpiroc Pit Viper 271 · exchange unit in storeParts ready
EX-031,000-hour serviceLiebherr R 9400 · due in 62 SMUPlanned stop
HT-31No open strategy actionsHitachi EH4000AC-3 · next PM in 310 SMURunning
Unplanned stops this shift: 0Mixed fleet · OEM-neutral

The goal

Maximum machine and fleet availability

Every hour a truck sits in the workshop waiting on a diagnosis, a part or a fitter is an hour of production lost. A planned stop costs far less than a breakdown, because the crew, the parts and the bay are ready before the machine arrives.

Availability =Scheduled hours − DowntimeScheduled hours

We lift availability by turning unplanned downtime into shorter, planned stops, and by making sure the planned ones finish on time.

Fewer unplanned stops

Strategies built on your own failure history and component lives, so failures are caught as conditions or intervals, not breakdowns.

Planned stops done on time

Planned maintenance, component change-outs and rebuilds scheduled and triggered from the asset register on meter hours, calendar or condition.

Parts there when the job starts

Kits, critical spares and min-max levels set from the strategy itself, so no planned job waits on the warehouse.

The program · six stops

From asset register to parts on the shelf

Each stop builds on the one before it. You get a baseline you can measure against, a strategy your own crew agreed to, and a system that runs it every shift.

  1. Asset register review and baseline audit

    Pronto XiDynamics 365SAP

    We review the asset register where it lives today: equipment hierarchy, criticality, meter readings, component records and work order history. Then we audit the data to set baselines for availability, failure rates and repair times, so every later change can be measured.

    You get
    • Asset register health report
    • Criticality ranking by machine and system
    • Baseline availability, MTBF and MTTR
    • Planned vs unplanned work ratio
    More on stop 01 →
  2. Maintenance strategy audit

    PM tasksIntervalsComponent lives

    We audit your maintenance strategies against what actually happens to your machines. PM tasks and intervals against OEM recommendations, component change-out lives against achieved hours, and breakdowns against the tasks that should have caught them.

    You get
    • Strategy gap list by fleet and component
    • Bad actors and repeat failures
    • Component life vs target
    • Agenda for the site workshop
    More on stop 02 →
  3. Workshop at your site

    On siteYour crewYour machines

    We come to the mine. With your maintenance team we walk the fleet, the workshop and the warehouse, review each strategy against the findings, and agree a recommendation for every gap together. Nothing is decided from a remote office.

    You get
    • Recommendations agreed with the site team
    • Owner and priority for each action
    • Signed-off future strategy scope
    More on stop 03 →
  4. Code the future strategy

    Task listsTriggersChange-out plans

    We write the agreed recommendations into a structured future strategy: task lists, intervals, meter and condition triggers, inspection points, and the replace or rebuild plan for each major component. It is written so a system can run it, not as a report for the shelf.

    You get
    • Future maintenance strategy, per fleet
    • Component replacement and rebuild plans
    • Bill of materials for each task
    More on stop 04 →
  5. Configure Asset Reliability Cloud and the asset register

    ARCERP work orders

    We configure Asset Reliability Cloud and your asset register to monitor and execute the strategy: planned maintenance, down maintenance, component replacement and rebuilds. Work flows back to your ERP as maintenance requests and work orders, with the evidence attached.

    You get
    • Strategy live in ARC and your ERP
    • Fleet board and alerts for the crew
    • Breakdown capture with failure codes
    More on stop 05 →
  6. Parts and min-max levels

    KitsCritical sparesRotables

    We set up the parts behind every task and the min-max levels that keep them on the shelf, from usage forecast in the strategy and real supplier lead times. Enough stock to execute the strategy on time, without cash tied up in parts nobody needs.

    You get
    • Kits linked to each planned task
    • Critical spares list
    • Min-max levels and reorder points
    • Rotable component pool plan
    More on stop 06 →

Stop 03 · Why we come to you

The strategy is set at the site, with the crew who run it.

A strategy written without the people who maintain the machines won't survive the first busy shift. That's why the workshop happens at the mine, next to the fleet. Your superintendents, planners and fitters review it with us and agree to it before anything is configured.

Maintenance superintendentPlanners and schedulersReliability engineersLeading hands and fittersWarehouse and supplyOEM and dealer reps

How the site workshop runs

In the field
Walk the fleet

See the machines, the operating conditions and the haul roads that drive failure modes.

In the workshop
Review the failures

Go through bad actors and repeat failures with the people who repaired them.

In the warehouse
Check the parts

Confirm what is on the shelf, what is critical, and what lead times really look like.

In the room
Agree the strategy

Walk through each strategy gap and agree a recommendation, an owner and a priority for every one.

What we measure

Baselined at stop 01, tracked every month after

AAvailability

Hours the machine is ready to work, by unit and by fleet.

MTBFMean time between failures

How long components run between unplanned stops.

MTTRMean time to repair

How long a machine is down once it stops.

P : UPlanned vs unplanned

Share of maintenance hours that were planned.

PMCPM compliance

Planned tasks completed within their window.

CLComponent life

Hours achieved against target life at change-out.

BLBacklog

Weeks of ready work waiting for a slot.

SOStock-outs

Planned jobs delayed by a missing part.

Questions

Before you book

Do we have to replace our ERP or maintenance system?

No. Your asset register and work orders stay in Pronto Xi, Microsoft Dynamics 365 or SAP. Asset Reliability Cloud reads from it and writes maintenance requests and work orders back, so planners keep their current screens.

We run a mixed fleet. Does that matter?

No. The program is OEM-neutral. Trucks, excavators, drills and support equipment from different manufacturers sit in the same strategy, and we use telematics where the manufacturer makes it available.

Why does the workshop have to be on site?

Because the people who run the strategy need to agree to it, and because the machines, the workshop and the warehouse tell you things the data does not. Recommendations made at the site get carried out.

Can we start with one fleet?

Yes. Many operations start with the fleet that hurts most, often haul trucks, then extend the program to loading, drilling and support equipment once the baseline improves.

Who owns the strategy and the data?

You do. The future strategy, the configuration and the data in your asset register belong to your operation.

Start with your asset register

Request a quote for a site review. We begin with stop 01: a review of your asset register in Pronto, Dynamics 365 or SAP, and a baseline of where your availability is today.

Get a quote

What we need to begin
  1. Read access to the asset register and work order history
  2. Your current maintenance strategies and PM schedules
  3. A site contact and a date for the workshop