Stop 01
Asset register audit and baseline
Every strategy depends on the asset register underneath it. We review it where it lives today and set the baseline that every later improvement is measured against.
What we check
We work from read access to your ERP. Nothing is changed at this stop; the goal is an honest picture of the data your maintenance runs on.
- Equipment hierarchy: sites, fleets, units, systems and components, and whether work is booked at the right level.
- Criticality: whether rankings exist, how they were set, and whether they match what really stops production.
- Meters: SMU hours and other meters, how they are captured and how current they are.
- Component records: serial-tracked major components, installed hours, positions and history.
- Work order history: order types, failure and cause codes, downtime and labour, to split planned from unplanned work.
- Maintenance plans: which PM plans exist, what they are attached to and whether they are being completed.
- Asset register health report
- Criticality ranking by machine and system
- Baseline availability, MTBF and MTTR
- Planned vs unplanned work ratio
- Data fix list for stop 05
Why the baseline matters
Without a baseline, nobody can say whether the program worked. We set it from your own history, so the numbers are ones your site already recognises.
The same measures are tracked every month after go-live: availability, mean time between failures, mean time to repair, planned vs unplanned work, PM compliance, component life, backlog and stock-outs.
Baseline measures
Eight numbers, set from your own data
Hours the machine is ready to work, by unit and by fleet.
How long components run between unplanned stops.
How long a machine is down once it stops.
Share of maintenance hours that were planned.
Planned tasks completed within their window.
Hours achieved against target life at change-out.
Weeks of ready work waiting for a slot.
Planned jobs delayed by a missing part.
FAQ
Questions
What access do you need?
Read access to the asset register, maintenance plans and work order history in your ERP, or an export of them. We agree the scope and data handling with your IT team before we start.
Our data is messy. Is that a problem?
No. Most registers have gaps, duplicate assets and inconsistent failure codes. Finding them is the point of this stop. The fix list feeds straight into stop 05.
Start with your asset register
Request a quote for a site review. We begin with stop 01: a review of your asset register in Pronto, Dynamics 365 or SAP, and a baseline of where your availability is today.