Stop 03 · On site
The strategy is set at your site
We come to the mine. The people who maintain the machines review the strategy with us, next to the fleet, and agree every recommendation before anything is configured.
Why it has to be on site
A strategy written in a remote office rarely survives the first busy shift. The people who run it need to agree to it, and the machines, the workshop and the warehouse show things the data does not.
Walking the fleet shows the haul roads, loading conditions and climate that drive failure modes. Talking to the fitters who did the repairs explains the failure codes. Standing in the warehouse shows what is really on the shelf.
Stop 03 · Why we come to you
The strategy is set at the site, with the crew who run it.
A strategy written without the people who maintain the machines won't survive the first busy shift. That's why the workshop happens at the mine, next to the fleet. Your superintendents, planners and fitters review it with us and agree to it before anything is configured.
See the machines, the operating conditions and the haul roads that drive failure modes.
Go through bad actors and repeat failures with the people who repaired them.
Confirm what is on the shelf, what is critical, and what lead times really look like.
Walk through each strategy gap and agree a recommendation, an owner and a priority for every one.
A typical workshop
How the days run
The length depends on the fleet and the number of gaps. This is a common shape for one fleet at one site, planned around your roster.
| When | Where | What happens |
|---|---|---|
| Day 1 morning | Field | Walk the fleet, haul roads and loading areas with supervisors. |
| Day 1 afternoon | Workshop | Review bad actors and repeat failures with leading hands and fitters. |
| Day 2 morning | Warehouse | Check critical spares, kits, rotables and real lead times with supply. |
| Day 2 to 3 | Meeting room | Work through every strategy gap and agree a recommendation, owner and priority. |
| Final session | Meeting room | Sign off the future strategy scope with the maintenance superintendent. |
What to have ready
We send a short pre-read from stops 01 and 02 a week before, so nobody walks in cold.
- The right people for at least part of each day: superintendent, planners, reliability engineer, leading hands, fitters, warehouse.
- Access to the fleet and the workshop, with site inductions arranged in advance.
- A meeting room with a screen for the strategy sessions.
- Optional: OEM or dealer representatives for the component sessions.
- Recommendations agreed with the site team
- Owner and priority for each action
- Signed-off future strategy scope
FAQ
Questions
Can the workshop be done remotely?
No. Being at the site, with the machines and the people who maintain them, is the point. Remote calls are used before and after, not instead.
How do you handle site inductions and safety?
We complete your site induction and follow your safety rules, permits and PPE requirements. We plan inductions with your site contact before the visit.
What if people cannot be released for three days?
We plan sessions around shifts and rosters so each group is only needed for its part, such as fitters for the workshop session and supply for the warehouse session.
Start with your asset register
Request a quote for a site review. We begin with stop 01: a review of your asset register in Pronto, Dynamics 365 or SAP, and a baseline of where your availability is today.
- Read access to the asset register and work order history
- Your current maintenance strategies and PM schedules
- A site contact and a date for the workshop