The program

Six stops from asset register to parts on the shelf

Every engagement follows the same pit lane. Each stop builds on the one before, so the strategy you end with is measured, agreed at your site and running every shift.

The goal

Maximum machine and fleet availability

Every hour a truck sits in the workshop waiting on a diagnosis, a part or a fitter is an hour of production lost. A planned stop costs far less than a breakdown, because the crew, the parts and the bay are ready before the machine arrives.

Availability =Scheduled hours − DowntimeScheduled hours

We lift availability by turning unplanned downtime into shorter, planned stops, and by making sure the planned ones finish on time.

Fewer unplanned stops

Strategies built on your own failure history and component lives, so failures are caught as conditions or intervals, not breakdowns.

Planned stops done on time

Planned maintenance, component change-outs and rebuilds scheduled and triggered from the asset register on meter hours, calendar or condition.

Parts there when the job starts

Kits, critical spares and min-max levels set from the strategy itself, so no planned job waits on the warehouse.

Six stops

How the program runs

  1. Asset register review and baseline audit

    Pronto XiDynamics 365SAP

    We review the asset register where it lives today: equipment hierarchy, criticality, meter readings, component records and work order history. Then we audit the data to set baselines for availability, failure rates and repair times, so every later change can be measured.

    You get
    • Asset register health report
    • Criticality ranking by machine and system
    • Baseline availability, MTBF and MTTR
    • Planned vs unplanned work ratio
    More on stop 01 →
  2. Maintenance strategy audit

    PM tasksIntervalsComponent lives

    We audit your maintenance strategies against what actually happens to your machines. PM tasks and intervals against OEM recommendations, component change-out lives against achieved hours, and breakdowns against the tasks that should have caught them.

    You get
    • Strategy gap list by fleet and component
    • Bad actors and repeat failures
    • Component life vs target
    • Agenda for the site workshop
    More on stop 02 →
  3. Workshop at your site

    On siteYour crewYour machines

    We come to the mine. With your maintenance team we walk the fleet, the workshop and the warehouse, review each strategy against the findings, and agree a recommendation for every gap together. Nothing is decided from a remote office.

    You get
    • Recommendations agreed with the site team
    • Owner and priority for each action
    • Signed-off future strategy scope
    More on stop 03 →
  4. Code the future strategy

    Task listsTriggersChange-out plans

    We write the agreed recommendations into a structured future strategy: task lists, intervals, meter and condition triggers, inspection points, and the replace or rebuild plan for each major component. It is written so a system can run it, not as a report for the shelf.

    You get
    • Future maintenance strategy, per fleet
    • Component replacement and rebuild plans
    • Bill of materials for each task
    More on stop 04 →
  5. Configure Asset Reliability Cloud and the asset register

    ARCERP work orders

    We configure Asset Reliability Cloud and your asset register to monitor and execute the strategy: planned maintenance, down maintenance, component replacement and rebuilds. Work flows back to your ERP as maintenance requests and work orders, with the evidence attached.

    You get
    • Strategy live in ARC and your ERP
    • Fleet board and alerts for the crew
    • Breakdown capture with failure codes
    More on stop 05 →
  6. Parts and min-max levels

    KitsCritical sparesRotables

    We set up the parts behind every task and the min-max levels that keep them on the shelf, from usage forecast in the strategy and real supplier lead times. Enough stock to execute the strategy on time, without cash tied up in parts nobody needs.

    You get
    • Kits linked to each planned task
    • Critical spares list
    • Min-max levels and reorder points
    • Rotable component pool plan
    More on stop 06 →

Stop 03 · Why we come to you

The strategy is set at the site, with the crew who run it.

A strategy written without the people who maintain the machines won't survive the first busy shift. That's why the workshop happens at the mine, next to the fleet. Your superintendents, planners and fitters review it with us and agree to it before anything is configured.

Maintenance superintendentPlanners and schedulersReliability engineersLeading hands and fittersWarehouse and supplyOEM and dealer reps

How the site workshop runs

In the field
Walk the fleet

See the machines, the operating conditions and the haul roads that drive failure modes.

In the workshop
Review the failures

Go through bad actors and repeat failures with the people who repaired them.

In the warehouse
Check the parts

Confirm what is on the shelf, what is critical, and what lead times really look like.

In the room
Agree the strategy

Walk through each strategy gap and agree a recommendation, an owner and a priority for every one.

Typical timing

What a first fleet looks like

Timing depends on fleet size, data quality and roster patterns. This is the shape of a typical first fleet, such as haul trucks at one site. We confirm the plan in the quote.

StopWhereWho from your side
01 Asset register auditRemote, with read access to your ERPERP or asset data owner, maintenance planner
02 Strategy auditRemote, with a call to walk through findingsReliability engineer or maintenance superintendent
03 Site workshopAt your siteSuperintendent, planners, leading hands, fitters, warehouse
04 Future strategyRemote, reviewed with the siteReliability engineer, planner
05 ARC and ERP configurationRemote and on site for go-livePlanners, ERP administrator, crew supervisors
06 Parts and min-maxRemote and in the warehouseSupply and warehouse lead, planner

What we measure

Baselined at stop 01, tracked every month after

AAvailability

Hours the machine is ready to work, by unit and by fleet.

MTBFMean time between failures

How long components run between unplanned stops.

MTTRMean time to repair

How long a machine is down once it stops.

P : UPlanned vs unplanned

Share of maintenance hours that were planned.

PMCPM compliance

Planned tasks completed within their window.

CLComponent life

Hours achieved against target life at change-out.

BLBacklog

Weeks of ready work waiting for a slot.

SOStock-outs

Planned jobs delayed by a missing part.

FAQ

Questions

Do we have to do all six stops?

The stops are designed to run in order, because each one depends on the last. Some operations already have parts of it in place, such as a recent strategy review. We check what exists at stop 01 and scope the rest around it.

How much of the work is on site?

The workshop at stop 03 is always on site, and we return for go-live at stop 05 and a warehouse review at stop 06. The audit and configuration work is done remotely with read access to your systems.

What happens after stop 06?

The Pitwall Crew keeps monitoring the measures with you each month, reviews bad actors and updates the strategy as component lives and failure patterns change.

Start with your asset register

Request a quote for a site review. We begin with stop 01: a review of your asset register in Pronto, Dynamics 365 or SAP, and a baseline of where your availability is today.

Get a quote

What we need to begin
  1. Read access to the asset register and work order history
  2. Your current maintenance strategies and PM schedules
  3. A site contact and a date for the workshop