The program
Six stops from asset register to parts on the shelf
Every engagement follows the same pit lane. Each stop builds on the one before, so the strategy you end with is measured, agreed at your site and running every shift.
The goal
Maximum machine and fleet availability
Every hour a truck sits in the workshop waiting on a diagnosis, a part or a fitter is an hour of production lost. A planned stop costs far less than a breakdown, because the crew, the parts and the bay are ready before the machine arrives.
We lift availability by turning unplanned downtime into shorter, planned stops, and by making sure the planned ones finish on time.
Fewer unplanned stops
Strategies built on your own failure history and component lives, so failures are caught as conditions or intervals, not breakdowns.
Planned stops done on time
Planned maintenance, component change-outs and rebuilds scheduled and triggered from the asset register on meter hours, calendar or condition.
Parts there when the job starts
Kits, critical spares and min-max levels set from the strategy itself, so no planned job waits on the warehouse.
Six stops
How the program runs
Asset register review and baseline audit
Pronto XiDynamics 365SAPWe review the asset register where it lives today: equipment hierarchy, criticality, meter readings, component records and work order history. Then we audit the data to set baselines for availability, failure rates and repair times, so every later change can be measured.
You getMore on stop 01 →- Asset register health report
- Criticality ranking by machine and system
- Baseline availability, MTBF and MTTR
- Planned vs unplanned work ratio
Maintenance strategy audit
PM tasksIntervalsComponent livesWe audit your maintenance strategies against what actually happens to your machines. PM tasks and intervals against OEM recommendations, component change-out lives against achieved hours, and breakdowns against the tasks that should have caught them.
You getMore on stop 02 →- Strategy gap list by fleet and component
- Bad actors and repeat failures
- Component life vs target
- Agenda for the site workshop
Workshop at your site
On siteYour crewYour machinesWe come to the mine. With your maintenance team we walk the fleet, the workshop and the warehouse, review each strategy against the findings, and agree a recommendation for every gap together. Nothing is decided from a remote office.
You getMore on stop 03 →- Recommendations agreed with the site team
- Owner and priority for each action
- Signed-off future strategy scope
Code the future strategy
Task listsTriggersChange-out plansWe write the agreed recommendations into a structured future strategy: task lists, intervals, meter and condition triggers, inspection points, and the replace or rebuild plan for each major component. It is written so a system can run it, not as a report for the shelf.
You getMore on stop 04 →- Future maintenance strategy, per fleet
- Component replacement and rebuild plans
- Bill of materials for each task
Configure Asset Reliability Cloud and the asset register
ARCERP work ordersWe configure Asset Reliability Cloud and your asset register to monitor and execute the strategy: planned maintenance, down maintenance, component replacement and rebuilds. Work flows back to your ERP as maintenance requests and work orders, with the evidence attached.
You getMore on stop 05 →- Strategy live in ARC and your ERP
- Fleet board and alerts for the crew
- Breakdown capture with failure codes
Parts and min-max levels
KitsCritical sparesRotablesWe set up the parts behind every task and the min-max levels that keep them on the shelf, from usage forecast in the strategy and real supplier lead times. Enough stock to execute the strategy on time, without cash tied up in parts nobody needs.
You getMore on stop 06 →- Kits linked to each planned task
- Critical spares list
- Min-max levels and reorder points
- Rotable component pool plan
Stop 03 · Why we come to you
The strategy is set at the site, with the crew who run it.
A strategy written without the people who maintain the machines won't survive the first busy shift. That's why the workshop happens at the mine, next to the fleet. Your superintendents, planners and fitters review it with us and agree to it before anything is configured.
See the machines, the operating conditions and the haul roads that drive failure modes.
Go through bad actors and repeat failures with the people who repaired them.
Confirm what is on the shelf, what is critical, and what lead times really look like.
Walk through each strategy gap and agree a recommendation, an owner and a priority for every one.
Typical timing
What a first fleet looks like
Timing depends on fleet size, data quality and roster patterns. This is the shape of a typical first fleet, such as haul trucks at one site. We confirm the plan in the quote.
| Stop | Where | Who from your side |
|---|---|---|
| 01 Asset register audit | Remote, with read access to your ERP | ERP or asset data owner, maintenance planner |
| 02 Strategy audit | Remote, with a call to walk through findings | Reliability engineer or maintenance superintendent |
| 03 Site workshop | At your site | Superintendent, planners, leading hands, fitters, warehouse |
| 04 Future strategy | Remote, reviewed with the site | Reliability engineer, planner |
| 05 ARC and ERP configuration | Remote and on site for go-live | Planners, ERP administrator, crew supervisors |
| 06 Parts and min-max | Remote and in the warehouse | Supply and warehouse lead, planner |
What we measure
Baselined at stop 01, tracked every month after
Hours the machine is ready to work, by unit and by fleet.
How long components run between unplanned stops.
How long a machine is down once it stops.
Share of maintenance hours that were planned.
Planned tasks completed within their window.
Hours achieved against target life at change-out.
Weeks of ready work waiting for a slot.
Planned jobs delayed by a missing part.
FAQ
Questions
Do we have to do all six stops?
The stops are designed to run in order, because each one depends on the last. Some operations already have parts of it in place, such as a recent strategy review. We check what exists at stop 01 and scope the rest around it.
How much of the work is on site?
The workshop at stop 03 is always on site, and we return for go-live at stop 05 and a warehouse review at stop 06. The audit and configuration work is done remotely with read access to your systems.
What happens after stop 06?
The Pitwall Crew keeps monitoring the measures with you each month, reviews bad actors and updates the strategy as component lives and failure patterns change.
Start with your asset register
Request a quote for a site review. We begin with stop 01: a review of your asset register in Pronto, Dynamics 365 or SAP, and a baseline of where your availability is today.
- Read access to the asset register and work order history
- Your current maintenance strategies and PM schedules
- A site contact and a date for the workshop