PITWALLFLEET RELIABILITY
ProgramPitwall CrewSite workshopPlatformPartsInsightsAbout

Stops 02 and 04

Maintenance strategy review

We audit what your strategies say against what actually happens to your machines, then code the agreed changes into a future strategy that a system can run.

Stop 02: auditing the strategy

A maintenance strategy is only as good as its match to the real failure modes. We compare each part of it with the evidence in your history.

  • PM tasks and intervals against OEM recommendations and your operating conditions.
  • Breakdowns against the tasks that should have caught them. Which failures had no task at all?
  • Component change-out lives against achieved hours, by component and position.
  • Bad actors: the units and components that cause most of the downtime.
  • Inspections and condition monitoring: oil analysis, telematics alarms and inspection findings, and whether anyone acts on them.
You get
  • Strategy gap list by fleet and component
  • Bad actors and repeat failures
  • Component life vs target
  • Agenda for the site workshop

Then we take it to your site

The gap list is not a recommendation yet. It goes to the site workshop, where your crew reviews every gap with us and agrees what to do about it.

Stop 04: coding the future strategy

After the workshop, we write the agreed recommendations into a structured future strategy. It is built to be loaded into Asset Reliability Cloud and your ERP, not printed and filed.

  • Task lists and intervals per fleet and model.
  • Meter, calendar and condition triggers, including inspection points.
  • Grouping of tasks into planned stops and shutdown windows.
  • Replace or rebuild plan for each major component, with target lives.
  • Bill of materials for every task, ready for kitting.
You get
  • Future maintenance strategy, per fleet
  • Component replacement and rebuild plans
  • Bill of materials for each task

FAQ

Questions

Is this the same as RCM?

It draws on the same thinking: failure modes, consequences and the right task for each. It is scoped to be practical for an operating site, starting from your existing strategy and failure history rather than a blank page.

Do you use OEM recommendations?

Yes, as a starting point. Intervals and tasks are then adjusted for your operating conditions and your own failure and component life data, and agreed with your site.

Start with your asset register

Request a quote for a site review. We begin with stop 01: a review of your asset register in Pronto, Dynamics 365 or SAP, and a baseline of where your availability is today.

Get a quote

What we need to begin
  1. Read access to the asset register and work order history
  2. Your current maintenance strategies and PM schedules
  3. A site contact and a date for the workshop