Stop 06 · Supply

Enough parts to run the strategy on time

A planned stop is only short if the parts are there. We set stock from the strategy itself, not from last year’s spend, so planned work starts on time without cash tied up in parts nobody needs.

Four parts of the parts plan

Kits

A kit for every planned task

Each PM and change-out has its parts list linked, so the planner can stage a complete kit before the stop.

Min-max

Levels from forecast use and lead time

Reorder points cover the demand while an order is in transit, using the usage forecast in the strategy.

Critical spares

Held on purpose

Long-lead, high-impact items identified with the site team and held deliberately, even if they rarely move.

Rotables

Pool sized to the change-out plan

Enough exchange units to cover forecast change-outs while others are away at rebuild.

How min-max works

The order is placed before the shelf runs dry

Stock falls with use. When it reaches the minimum, the reorder point, an order is placed. The minimum is set so stock lasts through the supplier lead time.

Min-max in action · wheel motor brush kitsIllustrative
lead time1040MaxMin · reorder pointorderdeliveredwk 04812162024

How we set the levels

The numbers come from the strategy and from your stores data, then get checked in the warehouse with your supply team.

  • Forecast usage from planned tasks and expected change-outs, plus history for breakdown parts.
  • Real lead times from purchase history, not the catalogue figure.
  • Safety stock sized to the cost of a stock-out for that part.
  • Maximum set by order quantity, shelf life and space.
  • Review as usage, lead times and the strategy change.
You get
  • Kits linked to each planned task
  • Critical spares list
  • Min-max levels and reorder points
  • Rotable component pool plan

FAQ

Questions

Will this increase our inventory?

It rebalances it. Some critical parts go up because they are needed on purpose; slow movers with no link to the strategy can come down. The aim is fewer stock-outs on planned work for the cash you hold.

Do the levels live in our ERP?

Yes. Min-max levels, reorder points and kits are set up in Pronto Xi, Dynamics 365 or SAP so purchasing works as it does today.

Start with your asset register

Request a quote for a site review. We begin with stop 01: a review of your asset register in Pronto, Dynamics 365 or SAP, and a baseline of where your availability is today.

Get a quote

What we need to begin
  1. Read access to the asset register and work order history
  2. Your current maintenance strategies and PM schedules
  3. A site contact and a date for the workshop