PITWALLFLEET RELIABILITY
ProgramPitwall CrewSite workshopPlatformPartsInsightsAbout

Pitwall Crew

The crew on your pit wall

In a race team, the pit wall watches every car and calls the stop. The Pitwall Crew does that for your fleet: they audit what you have, plan the strategy with your site, put it to work and keep watching it, shift after shift.

Who is on the crew

Specialists for every part of the job

Each engagement is staffed for the fleet and the systems you run. These are the roles you will work with.

Lead

Reliability engineer

Owns the strategy. Analyses failure history and component lives, leads the site workshop and signs off the future strategy with your superintendent.

Planning

Maintenance planner

Turns the strategy into work: task lists, intervals, grouped planned stops and shutdown windows that your planners can schedule.

Data

Asset data specialist

Knows Pronto Xi, Dynamics 365 and SAP. Audits and cleans the asset register, hierarchy, meters and component records, and configures the ERP side.

Platform

ARC configuration specialist

Sets up Asset Reliability Cloud: triggers, fleet board, alerts, breakdown capture and the link back to your ERP.

Supply

Spares and inventory analyst

Builds kits, critical spares lists, min-max levels and rotable pool plans from the strategy and real lead times.

Contact

Engagement lead

Your single point of contact. Runs the plan, the site visits and the monthly reviews, and keeps the crew and your team in step.

Phase 1 · Audit

Audit: find out what is really happening

Before anything changes, the crew establishes the facts. They work from read access to your ERP and the documents you already have, then check the findings with your team.

  • Asset register: equipment hierarchy, functional locations, criticality, serial numbers, meters and component records, checked for gaps and duplicates.
  • Work history: work orders by type, failure codes, labour and downtime, to separate planned from unplanned work.
  • Baselines: availability, MTBF, MTTR, PM compliance, backlog and stock-outs, by unit and by fleet.
  • Maintenance strategies: PM tasks and intervals against OEM recommendations and against the failures you actually have.
  • Component lives: hours achieved at change-out against target, by component and position.
  • Stores: stock on hand, usage, lead times and stock-outs for the parts the strategy depends on.
Crew on this phase
  • Asset data specialist
  • Reliability engineer
  • Spares and inventory analyst

Phase 2 · Plan

Plan: agree the strategy at your site

Planning happens at the mine, with the people who will run the strategy. The crew walks the fleet, the workshop and the warehouse with your team, then works through every gap in the room until there is an agreed recommendation, an owner and a priority.

Back at base, the crew codes the agreed recommendations into the future strategy, in a form the system can run.

  • On-site workshop with superintendents, planners, reliability engineers, leading hands, fitters and warehouse.
  • Future strategy per fleet: task lists, intervals, meter and condition triggers, inspection points.
  • Component replacement and rebuild plan for each major component.
  • Bill of materials and kit for every planned task.
  • Parts plan: critical spares, min-max levels and rotable pool size.
Crew on this phase
  • Reliability engineer (leads the workshop)
  • Maintenance planner
  • Spares and inventory analyst
  • Engagement lead

Phase 3 · Execute

Execute: put the strategy to work

The crew configures the systems so the strategy runs itself: Asset Reliability Cloud watches meters and condition, and your ERP gets the work at the right time with the parts already planned.

  • Asset register updated in Pronto Xi, Dynamics 365 or SAP: hierarchy, meters, components and criticality.
  • Planned maintenance triggered on SMU hours, calendar or condition and grouped into planned stops.
  • Down maintenance captured with failure codes and causes, so every breakdown improves the strategy.
  • Component replacements and rebuilds forecast months ahead, with exchange units and rebuild vendors lined up.
  • Parts set up as kits, critical spares and min-max levels in the ERP.
  • Go-live on site: planners and supervisors trained on the fleet board, alerts and the new work flow.
Crew on this phase
  • ARC configuration specialist
  • Asset data specialist
  • Maintenance planner
  • Spares and inventory analyst

Phase 4 · Monitor

Monitor: keep watching, keep improving

A strategy drifts unless someone watches it. The crew stays on your pit wall after go-live, tracking the measures set at the baseline and calling out problems before they become breakdowns.

  • Monthly reliability review against the stop 01 baseline: availability, MTBF, MTTR, planned vs unplanned, PM compliance.
  • Bad actor and repeat failure review, with root cause and a strategy change where needed.
  • Component life tracking: change-outs coming up, early failures and life extension opportunities.
  • PM compliance and backlog checks, so planned work does not slip.
  • Min-max and stock-out review as usage and lead times change.
  • Strategy updates written back into ARC and the ERP, so the improvement sticks.
Crew on this phase
  • Reliability engineer
  • Engagement lead
  • Spares and inventory analyst

FAQ

Questions

Does the Pitwall Crew replace our maintenance team?

No. Your planners, supervisors and fitters keep running maintenance. The crew adds reliability engineering, data and supply capacity alongside them, and hands the strategy over in your systems.

How often is the crew on site?

For the site workshop, for go-live and for warehouse reviews, plus visits agreed in the monitoring phase. The rest is done remotely, with regular calls with your team.

Can the crew work around our roster?

Yes. Site visits are planned around your rosters and shutdowns so the right people are in the room.

Put the crew on your pit wall

Tell us about your fleet and your ERP, and we will scope the audit, the site workshop and the monitoring that fits your operation.

Get a quote

What we need to begin
  1. Read access to the asset register and work order history
  2. Your current maintenance strategies and PM schedules
  3. A site contact and a date for the workshop